1. To prevent looseness, please use gasket when installing contactor. M4 screw should be used at the installation of contactor, and the locking torque of screw should be controlled within 1.8N·m~2.7N·m; the allowable pulling force of lead out pin of contactor is (1) load outlet: ≤ 49n; (2) coil lead out pin: ≤ 49n. In case of exceeding the range, it may cause damage.
2. Please avoid sticking grease and other foreign matters on the lead-out piece, and use the connecting wire with the specification of more than 2.5mm², otherwise it may cause abnormal heating of the lead-in end.
1. The document is for customer reference only. Huanfang has made every effort to ensure the accuracy of the information in this document. However, mistakes are inevitable, and the products, specifications and parameters may be changed due to product improvement. For the specific parameters and performance of each product, please refer to the specifications and samples provided by Huanfang without further notice.
2. As for the application field, it is impossible for Huanfang to evaluate all performance parameters of contactor in each specific application field. Therefore, customers should select the products matching with the contactor according to the specific service conditions. If the requirements are not specified clearly, please contact Huanfang for more technical support. Huanfang clearly states that the information in this document is only for selection reference, and the responsibility of product selection is only the responsibility of the customer.